basement finish including bar and entertainment center installation

Project details

materials: Oak wood and molding millwork provided by Trim & More. Franke stainless steel sink, Grohe bar faucet, Bose entertainment system and surround sound speakers built in throughout.

time to completion:  This basement took approximately 6 weeks to complete. All walls were framed up starting from block. Structural column was removed from center of room after reinforced micro laminate beams were added to structurally carry the load upstairs for the floor joists above. Walls were all wired for built in surround sound speakers and insulated prior to drywall installation. All HVAC modification were made within soffited areas to eliminate register cover outlets visible whenever possible. Drywall was installed and pre painted prior to custom waincoting , entertainment center, and bar finish carpentry installations. All millwork was then spray finished to achieve furniture quality coating. Walls and ceiling were primed and painted to designer's specifications.